Rooftop & ground-mount solar
Generate your own power during the day on factory, warehouse and office roofs, or on open land, and buy less from the grid and the diesel supplier.
How commercial solar works
The aim is to use as much of your own solar as possible, while the grid covers the rest.
Sized to your daytime load
Most businesses use the most power in daylight. We size the array so you use nearly everything it produces.
Works alongside the grid
Solar supplies the site first and the grid makes up the difference, automatically.
Controls what goes back to the grid
Where exporting is not allowed or paid, an export limiter keeps all solar on site.
Roof or ground
Roofs use space you already have. Ground mounts suit sites with open land or weak roofs.
Rooftop or ground-mount?
| Rooftop | Ground-mount | |
|---|---|---|
| Space | Uses existing roofs | Needs open, unshaded land |
| Structure | Roof must carry the extra load | Its own frame and foundations |
| Cost of mounting | Usually lower | Usually higher |
| Cleaning and access | Needs safe roof access | Easier from the ground |
| Room to grow | Limited by roof area | Easier to extend |
What we assess
A site assessment comes before any proposal.
- Roof structure, age and condition, or the land available
- Shading from buildings, trees and tanks
- Your load profile: bills, meter data and operating hours
- Electrical capacity: main switchboard, transformer and connection
- Grid connection rules for exporting or limiting export
Who it suits
- Factories, warehouses and workshops
- Offices, schools, hospitals and hotels
- Retail sites and shopping centres
- Farms with daytime processing or cold rooms
What’s included
- Solar modules and mounting system
- Inverters sized to the array
- DC and AC protection, earthing and lightning protection
- Export control where needed
- Monitoring with site-level reporting
- Commissioning, documentation and handover
Approvals handled, equipment brands and warranties to be confirmed.
Good to know before you decide
Grid-tied solar switches off in an outage
For safety, it stops when the grid goes down. Backup needs battery storage or a hybrid design.
Old roofs may need work first
Panels last decades. If the roof needs replacing soon, it is cheaper to do it before installation.
Savings depend on your tariff and load
Your proposal shows the calculation and its assumptions, not a guaranteed figure.
Questions about commercial solar
Will solar keep the site running during outages?
Not on its own. Grid-tied systems switch off for safety when the grid fails. Add battery storage or a hybrid system for backup.
How long until it pays for itself?
It depends on your tariff, how much power you use in daylight and the system cost. Your proposal includes a payback estimate with its assumptions.
Can we sell extra power to the grid?
It depends on current grid rules and your connection. We confirm what is allowed for your site.
Tell us what you need to power
Share a few details and our team will get back to you to talk through options. Prefer to talk now? Call or message us.